San Mateo Tank Transmission Main

Status

Accepting Bids

Prebid Date 4/23/25 1:30pm
Bid Date 5/8/25 3:00pm

Company & Contacts

North Marin Water District
Avram Pearlman  

Location

End of San Mateo Way, Novato, CA (APN 124-020-07 and 124-020-24)

The Work includes, but is not limited to:

1. 1,500 LF of HDPE Transmission Main

2. 800 LF Roadway Decommissioning

3. Installation of Temporary Access improvements including culverts for swale crossings

4. Removal of Temporary Access Improvements and Restoration.

5. Clearing and Grading, Including Trimming and Removal of Trees

6. Excavation of Hard Rock

7. 3,000 LF Furnish and Install 2” Conduit

8. Furnish and Install New Flex Tend Force-Balanced Expansion Joint Assembly

9. Furnish and Install two (2) precast vaults and steel fabricated spool with manway

10. 70 LF Furnish and Install Chain Link Fencing

11. Site Drainage

The District’s Estimate of Probable Cost for this project is $1,250,000.

 

A MANDATORY prebid conference will be held at 1:30 pm on Wednesday April 23, 2025 at the NMWD Office Building, 999 Rush Creek Place, Novato. A site visit tour will be conducted immediately following the pre-bid conference. Attendance at both the prebid conference and subsequent site visit is mandatory for all prospective bidders