NMWD HQ Recycle Water Main Extension from Redwood Blvd. Project
The Work includes the furnishing of all labor, materials, incidentals, and equipment necessary for the NMWD HQ RW EXTENSION FROM REDWOOD BLVD. The Bidder shall be required to provide, at its own cost and expense, all necessary insurance, as required by law or these specifications, and shall pay the cost and expense of any and all incidental matters herein required.
Addendum 1
(click to expand/collapse)
Name | Size | |||
6501.48 RW Main Extension Addendum 01 with Attachments | 2.4 MB |
Addendum 2
(click to expand/collapse)
Name | Size | |||
1.6501.48 RW Main Extension Addendum Number 02 | 347.7 KB |
Addendum 3
(click to expand/collapse)
Name | Size | |||
5.6501.48 RW Main Extension Addendum Number 03 | 168.8 KB |